Posts Tagged ‘Windsor’

Bike the Bridge 2011: Detroit to Windsor and back

Tuesday, June 14th, 2011

Over 300 riders from the U.S. and Canada rode in the 2011 Bike the Bridge event.

Those starting in Detroit checked in at the Milliken State Park on the RiverWalk. The group rode to the Ambassador Bridge and over to Windsor. It was here that 90 Windsor bicyclists joined the group and rode back over the bridge to Detroit.

Cyclists were reminded to keep moving and not stop. It’s not everyday that traffic across one of the world’s busiest international crossings is stopped for bicyclists.

Once back at Milliken State Park, riders ate breakfast before heading out on either a 24-mile or 45-mile guided tours. The shorter tour included the Dequindre Cut, Eastern Market, Belle Isle and Indian Village.

Perhaps one of the best comments on the event came from Tristan via Facebook.

Wow! Yesterday’s tour was an amazing experience. I have a very different perspective on the City of Detroit. Thank you to the organizers and volunteers who put so much work into this. I can’t imagine how much time it must have taken. Looking forward to seeing everybody next year.

More photos on Flickr: Ravenswift and OurWindsor

Registration opens for Bike the Bridge 2011

Sunday, May 8th, 2011

On June 12th, the busiest North American international border crossing will be closing very briefly for bicyclists riding in the Bike the Bridge event.

The only way to register for this event is on-line and that is now open.

This is a very special Biking event. The Ambassador Bridge, spanning from Detroit to Windsor, is shut down to car traffic. Canadians will be able to ride across the entire bridge. American riders will ride to the middle of the bridge, meet the Canadians, and ride back to Detroit. Breakfast will be provided after the bridge ride, on the Detroit Riverfront, at William G. Milliken State Park. Then one of two tours can be selected. The short tour will be approximately 15 miles in length. The Long tour will be approximately 45 miles in length. The details of the tours are still being planned.  If you want to attend this event you must have a valid Passport, Passport card, enhanced driver’s license, or Nexus.

No riders under age 16 please.

Registration closes early — May 27th — so that the information can be forwarded to the U.S. and Canadian Customs. Don’t delay!

There is also a Bike the Bridge page on Facebook.

Detroit Riverwalk under construction at new port

Thursday, May 5th, 2011

The Detroit RiverWalk remains closed near Hart Plaza. This closure is due to the construction of the new port and wharf for cruise ships and ferry service.

There is a ribbon cutting being planned for June. However there’s a chance this section of RiverWalk will be opened closer to the beginning next month.

The Detroit Free Press recently had an article regarding this project.

The port authority is working with officials in Windsor, local businesses and private ferry consultants on a market study to determine the feasibility of ferry service between Detroit and Windsor, Kerr said. Service could begin as early as 2012.

Supporters say a ferry could have a built-in demand from tourists and an estimated 6,000 commuters who work in one country and live in the other, including about 4,000 health care workers.

As we mentioned before, this international ferry service would be invaluable for cyclists wanting to get between Detroit and Canada.

Windsor updates: Bikes, Trains, and Ferries

Sunday, April 10th, 2011

Bicycle Use Master Plan underfunded

The Windsor Star has a brief mention of the city of Windsor’s bicycling efforts, which according to some bicycling advocates is moving too slowly.

Members of the Windsor Bicycling Committee and the advocacy group Bike Friendly Windsor were at Wednesday’s capital budget meeting to implore council to devote more money to the Bicycle Use Master Plan (BUMP).

Drafted by the city in 2001, the 20-year plan was meant to show the city’s commitment to building an “easily accessible, safe and actively used” cycling network.

But Steve Konkle of Bike Friendly Windsor said BUMP has been the victim of “chronic underfunding.”

According to Konkle, Windsor has less than 25 miles of bike lanes.

Bike Train now daily

The Ontario Bike Train is now daily. The train makes it easy for cyclists to get between Windsor, London, Toronto, and other cities in Ontario. Bicycle racks are available for cyclists.

We spoke with Justin LaFontaine, Projects Director for Transportation Options and the founder of the Bike Train initiative. He said the big buzz among Toronto cyclists is riding in Detroit. And while they can take the bike train to Windsor, there is no option for them to get to Detroit.

They have had conversations with the Detroit/Wayne County Port Authority about ferry service across the Detroit River. The Port Authority is very interested in helping make that international connection for cyclists.

Until there is a convenient way for cyclists to cross the border, Detroit-area cyclists can drive to the Windsor train station. There’s also this interesting web site with the tag line, “Explore Ontario by bike. Stop at bicycle friendly places to eat, visit and sleep.”

What about AMTRAK?

One obvious question is what about bicycles on AMTRAK? The Pere Marquette and Blue Water lines should be getting roll-on bicycle service. However, we do not know about the Wolverine line, the line between Pontiac, Detroit, Ann Arbor, and Chicago. That line is not subsidized by MDOT and therefore is not required to have roll on service per an MDOT appropriations bill. We’re waiting to hear if AMTRAK will provide roll on service nonetheless.

Detroit bike shorts: MDOT, Trails, and Windsor

Thursday, December 23rd, 2010

MDOT Director to remain

We heard a rumbling last week that a new director of MDOT would be named. That would have been a shame since Kirk Steudle has been very supportive of Complete Streets and non-motorized transportation.  However, his support of the DRIC had cost him Republican support, to the point where some asked the state attorney general to look into allegations of MDOT publishing misleading data.

The Free Press is now reporting that he will continue to lead MDOT. We think this is a big positive for Michigan bicyclists.

West Bloomfield trail to grow

The West Bloomfield rail trail just added 2.3 miles of new abandoned rail line according to the Spinal Column.

“This acquisition has been over three years in the making. We are excited that all the past work and negotiations will eventually result in a universally-accessible trail in a few years,” said Parks and Recreation Director Dan Navarre. “It’s wonderful that the grant funding made this acquisition possible by funding the majority of the purchase.”

We’re not sure when the trail will be resurfaced to match the existing trail conditions. The article makes it sound as though cyclists and walkers could use the trail before it is completed. That would  be similar to what happened with the Clinton River Trail (part of the same railroad corridor) in Rochester Hills.

Windsor’s Riverside Drive

The Windsor Star is reporting on continued, thought apparently limited opposition to redeveloping Riverside Drive.

The project, which would see bike lanes and new pedestrian crossings installed across the city’s entire riverfront from east to west, would produce a huge improvement to the quality of life for a large number of Windsor residents at a relatively low price, while providing a major boost to the city’s image.

City planners had considered widening parts of the road, which was originally built on a narrow right-of-way to service cottages along the Detroit River.

But widening the road for vehicular traffic was rejected as unwanted by a majority of city residents, who cherish the road’s rustic, tree-lined character for jogging and cycling, not to mention Sunday drives with the top down.

That plans sounds like a Complete Street to us. We hope to see it built.