Posts Tagged ‘Conner Creek Greenway’

Inaugural Cycle into Spring ride is May 19th

Tuesday, May 1st, 2012

From the Conner Creek Greenway web site:

Join the Detroit Eastside Community Collaborative for the first annual Cycle into Spring!

Enjoy a pleasant pedal from the Detroit River to Eight Mile and back along the Conner Creek Greenway (CCG), nine miles of cycling infrastructure that traces the original Conner Creek and links people, parks, green spaces, neighborhoods, schools and shops. Five miles are complete; funds raised at Cycle into Spring! will support programming and the development of the final four miles of the greenway. Refreshments provided at rest stop.

Sites along the route include Chrysler Mack Assembly, Wayne County Community College, Chandler Park, Mt. Olivet Cemetery, Conner Playfield, Coleman A. Young Municipal Airport, Better Made Snack Food Factory and the Milbank Trail.

Cost: $25; $35 includes a full lunch from Slow’s Bar B Q post-ride. $15 lunch only.

Register now!

Check out our event on Facebook and tell your friends.

New Detroit bike lanes for 2012

Saturday, February 18th, 2012

There are bike lanes planned for the city of Detroit that are expected to be completed this year. Here’s a run down of those projects.

Midtown bike lanes

The below projects all tie together to create on consistent north-south bike route from Cass Tech to New Center. Though not a bike lane, phase II construction of the Midtown Loop will begin this year, extending the pathway south on John R and on Canfield from John R to Cass. The segment along Cass is now phase III.

Second Avenue from Grand Boulevard to Palmer – The street is being returned to two-way travel with bike lanes added for most of it. There is insufficient road width north of the railroad underpass so sharrows will be used.

Anthony Wayne Drive from Palmer to Warren – Bike lanes will be added.

Third Avenue from Warren to Ledyard – This segment will become all two-way with bike lanes.

Cass Park – All of the streets surrounding the park will receive bike lanes.

Conner Creek Greenway

Another phase of this eastside greenway is being constructed this year. This time the portion between 6 Mile and 8 Mile is the focus. E. Outer Drive and Conner Avenue below the Milbank Greenway (which is just north of E. Outer Drive) will get bike lanes.

Trumbull Enhancements

Bike lanes will be added to Trumbull from Warren Avenue north to about Holden. We haven’t seen the drawings, but that’s what we’ve heard. The City has said they would look into continuing the Trumbull bike lanes from Warren south to MLK though there is no timeframe for that.

Safety Improvement Projects

These are the safety projects we’d mentioned earlier. There is one additional public meeting to discuss safety improvements to West Chicago from Spinozza (Rouge Park) just about to Livernois. That meeting is Monday, February 20th from 5pm to 7pm at the Don Bosco Hall, 19321 W. Chicago. We’re told the plans for W. Chicago include bike lanes but we don’t know to what extent yet. We do know they make a great east-west connection to Rouge Park which has great roads, pathways, and trails for biking. Spinozza also connects with W. Outer Drive, another great Detroit biking road.

Dix Road from Waterman/W. Vernor to Woodmere – This is basically an extension of the existing bike lanes on W. Vernor which provides a connection with the pathway in Patton Park.

Central from W. Vernor to McGraw – Only portions of the Central will get bike lanes. At times the road is too narrow so sharrows will be used instead. Central become an even more critical biking route after the Detroit International Freight Transfer Project (DIFT) closes nearby Lonyo Road. Central is also part of the proposed Inner Circle Greenway route that encircles the city.

E. Seven Mile from I-75 to Gratiot is also a safety improvement project but there was insufficient room to add bike lanes. However, like the roads mentioned above, the designs are such that they encourage motorists to drive more prudently.

Detroit greenways ready for expansion

Monday, August 29th, 2011

Detroit RiverWalk

More sections of the RiverWalk should be under construction come next spring. That includes segments on both sides of Chene Park and the critical connection between Mt. Elliott Park and Gabriel Richard Park at the foot of the bridge to Belle Isle.

Mt. Elliott park is getting a new universal recreation play structure that includes a super cool water feature.

Gabriel Richard Park is getting a parking lot.

And the grassy land just north of the Wheelhouse Detroit is getting a children’s playground.

It’s not too late to buy tickets for the Shimmer on the River event, a fundraiser for the RiverWalk.

Today’s Crain’s Detroit Business has an article which includes more details on this exciting news.

Dequindre Cut

The Dequindre Cut rail corridor north of Gratiot is not only active but privately owned. The city of Detroit has been negotiating with the owner to acquire the property while allowing them to keep their rails, which are mostly used to railcar storage. The city is getting closer to finalizing the deal.

Once purchased, the trail will switch over to the west side of the Cut at Gratiot and continue north to Mack. The rails will remain on the east side of the Cut and will be fenced off. There will also be trail connection into Eastern Market near Wilkins and near the Greening of Detroit’s urban agriculture demonstration area.

The city will likely apply for significant grant funding this fall to build this extension, as well as complete some Eastern Market streetscaping, build a bike/walk connection to the Midtown Loop, add bikes lanes to Hamtramck, and repair the bridges over the Cut.

Midtown Loop

The last we knew, construction for Phase II of the Midtown Loop will begin this fall. That includes the sections along Canfield and Cass.

Conner Creek Greenway

The next segment to be built will run from Eight Mile to McNichols along Conner Avenue. It includes new sidewalk, bike lanes and bike route signs. That won’t likely begin until next year.

Ribbon cut on new section of Conner Creek Greenway

Saturday, April 30th, 2011

Another section of the Conner Creek Greenway was opened yesterday in Detroit on Arbor Day — a holiday for tree planting created by a J. Sterling Morton, a Michigan Wolverine from Monroe, Michigan.

The event at Maheras Gentry Park began with a parade, music, and a long line of kids from the Detroit Merit Charter Academy. The kids were dressed in frog costumes they had made earlier. The frog theme was a nod to the parks historic condition as marshland. It was an amazing site to see.

Following the parade, remarks were made by those who helped make this greenway possible (i.e. the funders): Karla Hall of the DTE Energy Foundation, Tony Kratofil of MDOT, and Tom Woiwode from the Community Foundation for Southeast Michigan.

During his remarks, Kratofil announced MDOT’s commitment to funding the next portion of the Conner Creek Greenway. That portion is along Conner Avenue from McNichols to Eight Mile. That project includes a new section of sidewalks, bike lanes, bike routes, and some landscape improvements.

Wayne County Commissioners Tim Killeen and Bernard Parker also presented a resolution from the commission as well.

The new sections of greenway had been mostly completed late last year. That included bike lanes from Jefferson to Maheras Gentry Park along Clairpointe and a shared-use path from the park entrance to the existing paths near the river. The bike lanes on St. Jean built earlier last year were also part of the opening celebration.

Crain’s Detroit Business and Model D has media coverage prior to the event, while TV20 News has post-event coverage.

Conner Creek Greenway: new bike lanes and path

Thursday, November 18th, 2010

Below are some photos taken this week of the new Conner Creek Greenway segment from Jefferson Avenue to the Detroit River at Mahera Gentry Park.

This 1.3 mile segment includes four different types of bicycle facilities! We have photos of each type.

Photo 1: Starting at Jefferson and heading south, there is a short stretch of shared, signed-roadway. It is signed as such.

Photo 2: The bike lanes begin.

Photo 3: Bayview Yacht Club needed occasional special events parking along Clairpointe about four times a year. There wasn’t enough roadway width for bike lanes and dedicated parking, so only the latter was constructed. However, since there are very rarely any cars parked here, it becomes a wide de facto bike lane. The road is signed as a bike route, too. This is a clever win-win solution that’s been used successfully in Chicago.

Photo 4: This is where approximately 2,000 (?) feet of shared-use path winds through Maheras Gentry Park and ends along the Detroit River.